Indonesia Engineering Tyre Parts Information GuideIndonesia Engineering Tyre Parts Information GuideIndependent tyre, rim and tyre-part information guidance
Receipt Records and Discrepancies

The tyre sidewall, rim label and delivery list do not match: what should the receiving team record?

Receiving guidance for linked discrepancy records when tyre sidewall, rim label and delivery list do not match on an inter-island worksite delivery.

The tyre sidewall, rim label and delivery list do not match: what should the receiving team record?

Record a linked receipt discrepancy: connect the order line and quantity to the exact sidewall marks, the exact rim-label marks, the delivery-list entry, packaging condition, transport and storage observations, supplied documents and receipt photographs. Treat the mismatch as unconfirmed until written clarification and an agreed handling decision are received. Do not install, inflate, mount, demount or test the disputed item, and do not alter labels or discard packaging.

1. What to record at receipt

Link the record to the order line

Start with the purchase order or order line, item description, quantity expected, quantity received, unit of measure and delivery reference. Record the machine model or equipment identifier, and any configuration suffix supplied. A suffix is the extra code that separates variants of the same machine or part reference; receiving should record it as supplied, not guess what it means.

Record the planned axle position only as a receiving reference. It does not confirm fitment. If the position is not stated in the order or delivery documents, write that it is missing.

Record the marks exactly as seen

For the tyre, record the sidewall marks as visible: brand, size, construction, load and speed index, pattern or model name, serial or batch-style marking where present, and any other supplied code. Do not polish, cover or change the marks before photographing them.

For the rim, record the rim label, stamp or tag exactly: rim size, part number, serial, supplier code and any other visible mark. If the rim has no readable label, record that fact and photograph the area where the label or stamp is expected. Do not move a label or add a mark to make the record look complete.

For the delivery list, record the line reference, description, quantity, marks and any attached packing list or picking list. Keep the delivery list and packaging labels linked to the same receipt record.

Record packaging, transport and storage observations

Record the condition of the packaging, seals, straps, pallets and labels as received. Note whether the packaging is intact, opened, wet, crushed, stained, re-taped or missing. Record transport observations that are visible at receipt, such as damaged wrapping or loose items. If the consignment came through an inter-island route to a remote worksite, record transfer points only where the documents or packaging show them; do not invent a route.

Record the storage location and condition at the receiving point, the date and time of receipt, and who made the observation. Keep the disputed item in a controlled receiving or hold area with its packaging and labels, unless responsible parties give written handling instructions.

List the supplied documents

List every document supplied with the delivery: purchase order copy, order confirmation, delivery note, packing list, picking list, invoice, transport document, supplier label and any certificate or declaration actually supplied. Do not assume a document covers the delivered item. Match document identifiers to the order line, sidewall marks, rim marks and delivery-list entry.

2. Separate confirmed observations from assumptions

A confirmed observation is something the receiving team can see or read on the item, packaging or document at receipt. An assumption is an explanation such as a picking error, a mixed batch, a wrong label, a superseded part or a supplier mistake. Record assumptions in a separate note and label them as unconfirmed. Do not let an assumption replace the exact marks.

Keep these questions separate:

  • Is the order line linked to the delivered item?
  • Is the quantity correct?
  • Do the sidewall marks match the delivery list?
  • Do the rim-label marks match the delivery list and the order?
  • Is the packaging condition consistent with the transport documents?
  • Is there enough evidence to decide fitment, batch quality, provenance or safe use?

A model number alone never confirms fitment. Photos and supplier statements are not proof of every claim. A statement that an item is equivalent, adapted or from the same batch needs its own evidence and should not be mixed with the basic receipt discrepancy.

3. Checks and missing evidence before handling

Ask for missing evidence in writing. Useful evidence includes the order line and purchase order, machine or equipment identifier with suffix, serials, planned or recorded axle position, the old tyre or rim for comparison where available, clear photographs of all delivered marks, delivery records, packaging labels and the applicable documents.

Ask the supplier or transporter to clarify which marks they intended to supply and whether the delivery list is correct. Request written confirmation of the agreed handling: hold, return, replace, re-document, inspect by a responsible party or another action allowed by the applicable terms. Do not treat a verbal statement as a final decision.

Keep sample findings, adaptation claims, provenance claims and batch acceptance separate. One photographed item does not prove every item in the delivery, and one statement about a batch does not confirm the identity of the delivered rim or tyre. If the worksite schedule is urgent, escalate for expedited written clarification; do not use an unverified item to keep work moving.

4. Procurement next step

Issue a written receipt discrepancy notice that links the order line, quantity, sidewall marks, rim-label marks, delivery-list entry, packaging condition, transport and storage observations, photographs and supplied documents. State only confirmed facts and list the missing evidence. Send it to the supplier, transporter and internal procurement contact as applicable.

Acceptance, rejection, replacement, credit or claim rights depend on the applicable contract, purchase order and transport terms. Receiving should not assert those rights without those terms. Only the responsible parties decide acceptance and handling. The next step is written clarification and an agreed handling decision, not installation or testing of the disputed item.

5. Commercial disclosure

Commercial disclosure: MechLink is an external commercial tool that may help organise disputed sidewall, rim-label and delivery-list entries with their order lines and receipt photos for a supply enquiry; it does not guarantee replacement, reimbursement or acceptance. It is not an official manufacturer, dealer, service centre, certification body, testing platform or database contact: MechLink website and WhatsApp +62 81292273888.

6. Sources

No external standards, reports, databases or supplier documents were used for this answer. The evidence to collect is the receipt record described above.