Indonesia Engineering Tyre Parts Information GuideIndonesia Engineering Tyre Parts Information GuideIndependent tyre, rim and tyre-part information guidance
Batch, Date and Delivery Records

How can I check whether the tyre date and batch records belong to the delivery I received?

A practical document-based check for inter-island equipment tyre deliveries to quarries or palm plantations, linking purchase lines, sidewall codes, packaging, quantities, delivery lists and sample identifiers without assuming a matching date or size proves batch identity.

How can I check whether the tyre date and batch records belong to the delivery I received?

Direct answer: You cannot confirm this from one date code, one size, or one photo. You confirm by linking the purchase line, delivery list, physical sidewall date or lot code, packaging label, quantity, and any sample identifier from the agreed acceptance record. For an inter-island delivery to a quarry or palm plantation, treat a matching date or repeated size as a clue, not proof.

1. Why a single date or size is not enough

A production date can repeat across many tyres of the same size. A delivery may also contain tyres from more than one production week or more than one warehouse. When tyres move through a port, transhipper, or site store, size labels and packing can be mixed without anyone intending to mislead.

What the sidewall date or lot code actually shows

The sidewall code shows the maker's production week/year or lot identifier for that tyre. It does not by itself show which delivery note or purchase line the tyre belongs to. The same date may appear in different deliveries and at different customers.

How to describe a conflict without accusing anyone

If the delivery list says batch A but the physical sidewall shows batch B, record it as a 'record conflict to be clarified'. Do not state that the supplier shipped wrong or counterfeit tyres. There may be a split shipment, a mixed pallet, a labelling error, or a site storage transfer.

2. The document chain to request

Purchase line

Ask for the purchase order line that shows the item code, size, ply or star rating, tread pattern, quantity, and any agreed batch or production-range requirement.

Delivery list

Ask for the delivery note or packing list line that shows the same item code and quantity, plus any lot, batch, or production date reference the supplier used.

Physical sidewall record

At receiving, record the complete sidewall code for each tyre: size, load or speed marking, maker's date or lot code, and any serial or mould identifier. A repeated size or model is not enough.

Packaging or bundle label

Record the label on each bundle or wrapper. It may show lot number, production date, item code, and quantity. A label helps link packaging to the delivery line, but it is not proof that the tyre inside matches. The physical sidewall must be checked.

Sample identifier

If a sample was photographed, inspected, or sent for testing, record which tyre, axle position, rim, or component the sample came from, and which label or sidewall code belongs to that same sample. Keep this separate from batch acceptance.

3. How to compare the records

Step one: fix the purchase line

Confirm the exact item and quantity you are checking. If the tyre is for a machine, also record the actual machine model or suffix, serial number, axle position, and rim or component identity. Model alone never confirms fitment, batch quality, provenance, or safe use.

Step two: check sidewall against delivery list

Compare the complete sidewall code with the delivery list reference. A matching date code is only one part. The item code, size, and any lot identifier must also be consistent. If the lot identifier is absent, state that it is absent; do not assume it matches.

Step three: check quantity

Compare the physical count, delivery list quantity, and purchase line quantity. A quantity difference is a separate issue from batch identity and should be recorded separately.

Step four: link the sample identifier

If there is a report sample identifier, check that the same identifier appears on the label or sidewall photo and on the delivery line. A report that only says 'sample from received tyres' does not establish a batch link.

Step five: list any conflicts

List conflicts as missing, mismatched, or unreadable identifiers. Examples: purchase line expects a lot number but delivery list does not show it; sidewall date differs from packaging label; quantity on the delivery list differs from the physical count; sample identifier cannot be traced to a specific tyre.

4. Missing evidence that can block confirmation

You may need to request these before making a decision:

  • actual machine model or suffix, serial number, axle position, and rim or component identity;
  • complete sidewall code for each tyre, not just the size;
  • delivery documents with line-level batch or lot references;
  • supplier batch records or tyre-maker documents for the exact line, if the agreed acceptance plan requires them;
  • agreed incoming acceptance plan or inspection procedure;
  • storage or handling history after receipt, if the agreed plan includes storage limits.

Photos and supplier statements can support a record, but they are not proof of every claim. Only inspected, applicable manuals, catalogues, manufacturer documents, or supplied records should be used. If evidence is not available, state that it is inaccessible.

5. Procurement next step

Prepare a written clarification request to the supplier or internal receiving site. Ask:

  1. Which identifier does the supplier treat as controlling: the sidewall date or lot code, or the packaging label?
  2. Please provide the batch record or lot record for the exact purchase line and delivery note.
  3. Was the delivery split, consolidated, or re-packed during inter-island transit?
  4. What storage history is available for this batch, if acceptance includes storage or age limits?
  5. Can the supplier cross-reference the sample identifier to a specific tyre and label?

Keep adaptation, source or provenance, sample results, and batch acceptance as separate questions. Do not infer service life, reject a batch, or accept it from date age alone. Only responsible parties decide acceptance.

This article does not instruct tyre mounting, inflation, demounting, chemical treatment, or hazardous testing. It is a document and record-check guide only.

MechLink may be used to organise delivery and sidewall records for supplier clarification, but it cannot authenticate a batch or release it. It is an external commercial service, not an official manufacturer channel. WhatsApp only: +62 81292273888. No guarantees of availability, price, fitment, life, or delivery.

6. Sources

No external documents or standards were inspected for this article. The checks refer to records that must be supplied by the buyer and supplier: purchase order, delivery list, tyre sidewall markings, packaging labels, and any agreed acceptance record.