Tyre Sidewall, Rim Label and Delivery List Mismatch: What Receiving Should Record
Record the three disputed entries exactly as found, link them to the order line and photos, mark the item for written clarification, and do not install, alter or discard it.
Tyre sidewall, rim label and delivery list do not match: what should the receiving team record?
1. Direct answer
Record the three entries separately and exactly as found: the delivery list entry, the rim label, and the tyre sidewall marks. Link each entry to the order line, quantity, photos, packaging condition, storage or transport observations, and supplied documents. Mark the item as discrepancy pending written clarification and agreed handling, then quarantine it from normal issue. Do not install, alter a label, or discard packaging. The next step is a written clarification request.
2. Why separate records matter
A mismatch is not one finding. It is at least three identity sources that disagree: sidewall, rim label, and delivery list. Recording them separately keeps confirmed observations distinct from assumptions.
Confirmed observation vs assumption
A confirmed observation is what the receiving team can see directly: the text on the sidewall, the text on the rim label, the line on the delivery list, the quantity, the packaging damage, and the storage or transport condition.
An assumption is a statement such as the sidewall is correct so the rim label must be old, or the part is probably the same because it looks similar. Do not record assumptions as confirmed facts.
Fitment and provenance limits
Model alone never confirms fitment, batch quality, provenance or safe use. Photos and supplier statements are not proof of every claim. Keep machine or suffix, serial, axle position, old tyre or rim, delivered marks, photographs, delivery records and applicable documents as separate evidence items.
3. Useful checks
These checks help build the record without deciding acceptance.
Order line and quantity
Record the purchase order line, item code and description as ordered, and compare it with the delivery list and physical quantity. Note if the delivery list over-delivers, under-delivers, or lists a different code.
Tyre sidewall marks
Record the sidewall markings exactly: size, load index or speed symbol, serial, plant or date code if present, and any other visible marking. Photograph the sidewall with enough context to show it belongs to the unit being receipted.
Rim label
Record the rim label text, where it is attached, whether it is readable, damaged or partly missing. A rim label is an identification aid, not proof by itself that the component is correct.
Packaging condition
Record whether the packaging is intact, wet, torn, crushed, opened, resealed, or missing. Keep the packaging until the discrepancy is clarified unless the responsible party instructs otherwise in writing.
Storage and transport observations
For an inter-island delivery to a remote worksite, record visible facts such as condensation, load shift, strapping condition, handling marks, or prolonged transit signs. Do not guess that transport caused the mismatch.
Photos and supplied documents
Photograph all three surfaces together where possible: delivery list, rim label, and tyre sidewall. Store the photos with the delivery note, order line, and any inspection or batch documents supplied.
4. Missing evidence
Request the missing evidence needed before acceptance. This may include:
- supplier clarification of which identity source is authoritative for the order;
- the correct order line, part code, machine or suffix, serial, axle position, and old tyre or rim details;
- clearer photographs or a physical inspection by a responsible person if the site cannot read a label;
- batch or provenance records if batch acceptance matters;
- the applicable supply terms for clarification and agreed handling.
Do not assert legal rejection rights without applicable terms. Only responsible parties decide acceptance.
5. Procurement next step
Send a written clarification request to the supplier or internal procurement contact. Attach the separate records, order line, quantity deviation, photographs, and a short list of the mismatching marks. State that the item is held in quarantine pending written clarification and agreed handling.
A tool such as MechLink is a commercial third-party organiser. It may organise disputed sidewall, rim label and delivery-list entries with their order lines and receipt photos for a supply enquiry, but it does not guarantee replacement, reimbursement or acceptance. See MechLink website or WhatsApp +62 81292273888. This is not an official contact.
6. Sources
No external standards, reports, databases or incident records were used. The guidance follows the question and general receiving-control practice.