Indonesia Engineering Tyre Parts Information GuideIndonesia Engineering Tyre Parts Information GuideIndependent tyre, rim and tyre-part information guidance
Receipt Records and Discrepancies

Tyre Sidewall, Rim Label and Delivery List Do Not Match: What the Receiving Team Should Record

How to record a tyre sidewall, rim label, and delivery list mismatch without assuming fitment, batch, or acceptance.

Tyre sidewall, rim label and delivery list do not match: what should the receiving team record?

For an inter-island delivery to a remote Indonesian worksite, the receiving record is often the main evidence. Record the mismatch as an open receiving discrepancy. Do not change the tyre sidewall mark, rim label, or delivery list to force a match. Keep each order line linked to the delivered component, quantity, and photographs. Separate confirmed observations from assumptions. Send a written clarification request to the supplier or internal procurement before any acceptance, fitment, or return decision is made.

1. What the receiving team should record

Confirmed observations

  • Order line number and item description from the delivery list.
  • Quantity delivered against the quantity listed.
  • Tyre sidewall markings exactly as seen: size, ply rating, load index or speed symbol, pattern or manufacturer code if legible.
  • Rim label or component mark exactly as seen, including any stamped or printed identifier.
  • The field where the marks disagree with the delivery list: size, model, batch, quantity, or description.

Condition and transport observations

  • Packaging condition: moisture, tears, crush damage, or loose labels.
  • Storage conditions during receipt: rain, sun, sea air, or stacking location.
  • Vessel or truck name and voyage or waybill number if available, but do not treat a voyage number as proof of quality.
  • Any sign of label tampering or re-labelling, described only as an observation.

Separating confirmed observation from assumption

Write 'sidewall marking reads X' instead of 'wrong tyre'. Write 'rim label says Y' instead of 'someone changed the label'. The delivery list is a document, not proof of physical history.

2. Useful checks and evidence to collect

Document checks

Keep the delivery order, packing list, invoice or proforma reference, and any pre-shipment photos the supplier provided. Mark the disputed line clearly.

Check the purchase order line and any suffix or serial reference. A model or part number alone does not confirm fitment, batch quality, provenance, or safe use for a specific axle or machine position.

Photo evidence

Photograph the tyre sidewall, rim label, full item, packaging label, and delivery list in the same frame where possible. Photos and supplier statements are supporting evidence, not proof of fitment or quality.

Take a close-up of the date or batch code only if legible; do not interpret the date code as fitment proof.

Serial and machine trace

If a tyre or rim is serialised, record the serial exactly. If the item is intended for a specific machine, axle, or position, record the machine or suffix and old tyre or rim reference from the work order if available. The receiving team should not decide safe use from these records alone.

Missing evidence to request

Request the supplier's packing photo, warehouse label, batch certificate, or manufacturer data sheet if the delivery list does not identify the item. If the rim label is incomplete, request the purchase specification line. Do not accept a verbal statement as replacement evidence.

3. Procurement next step after recording

Write to the supplier or internal buyer with:

  • the recorded discrepancy,
  • the order line and quantity,
  • links to the receipt photos or file names,
  • a request to confirm the correct item and handling.

Use wording such as: 'Please confirm whether the delivered marks match the order and advise the agreed handling.' Do not state that the part is rejected, unsafe, or eligible for refund unless the contract or purchase terms provide that right and the responsible party confirms it.

The next step is written clarification and agreed handling. Acceptance, replacement, return, or use remains with the responsible parties, not the receiving record. Keep adaptation, provenance, sample findings, and batch acceptance separate from the receiving record.

MechLink, an external commercial tool unrelated to the manufacturer or approval process, may help organise disputed sidewall, rim label and delivery-list entries with their order lines and receipt photos for a supply enquiry. It is not an official contact and does not guarantee replacement, reimbursement, or acceptance. MechLink website and WhatsApp +62 81292273888.

This is independent editorial guidance for receiving records, not an official manufacturer or certification position.

Sources

No external technical, regulatory, or manufacturer sources were used for this article. MechLink was referenced only as a commercial organisation tool in the body and is not a technical source.