Indonesia Engineering Tyre Parts Information GuideIndonesia Engineering Tyre Parts Information GuideIndependent tyre, rim and tyre-part information guidance
Receipt Records and Discrepancies

The tyre sidewall, rim label and delivery list do not match: what should the receiving team record?

Record the mismatch as an open receiving discrepancy, quarantine the item, link the order line to the delivered marks and documents, and request written clarification before acceptance.

The tyre sidewall, rim label and delivery list do not match: what should the receiving team record?

1. Direct answer

The receiving team should record the mismatch as an open receiving discrepancy. Keep the item quarantined as received, with packaging and labels intact. Link the delivery list line, ordered quantity, delivered quantity, sidewall markings, rim label, photographs, transport or storage observations, and supplied documents in one record.

Do not install, mount, inflate, relabel, discard packaging, or decide fitment from photos alone. The next step is a written clarification request to the supplier or the responsible procurement contact.

2. Why record before deciding fitment

A sidewall, rim label, and delivery list mismatch is a traceability and supply problem first. A visual check at receiving cannot confirm fitment, batch quality, provenance, or safe use.

At a remote Indonesian worksite supplied by inter-island delivery, the receiving team may not be able to get an immediate specialist answer. A clear record keeps the evidence usable when the supplier replies in writing.

3. Confirmed observations to record

Use factual entries only. Link each observation to the order line, delivery note number, and photograph file name.

Delivery list and order line

Record the order line, item code or description on the delivery list, ordered quantity, delivered quantity, and any batch or serial reference shown on the delivery note.

Sidewall and component marks

Record the exact sidewall markings that are visible: size, ply or load index, pattern or brand name, and any serial, DOT-like code, or suffix shown on the tyre. Photograph the full sidewall and a close-up of each mark.

Rim label and old reference marks

Record the rim label exactly as delivered. If an old tyre or rim is available, note the axle position and any old machine, suffix, or serial reference as a comparison. Do not treat an old part as proof that the new item fits.

Quantity, packaging and transport condition

Record the quantity received, packaging condition, any damage to wrapping, moisture, dust, or transport handling marks. Note whether the item arrived loose, banded, wrapped, or on a pallet. Photograph the package before opening when possible.

Photographs and supplied documents

List each photograph with a file name and the time and place it was taken. List every supplied document, such as delivery note, packing list, invoice, or batch statement. Note if a document is missing.

4. Assumptions to keep out

Do not write that the tyre is wrong fitment, rejected, unsafe, counterfeit, or from a bad batch. Those are conclusions that need more evidence and a responsible party decision.

Do not assume that the rim label alone proves the assembly is correct, or that a supplier statement by phone or message confirms fitment. Photos and supplier statements are not proof of every claim.

Keep adaptation, provenance, sample findings, and batch acceptance separate from the receiving observations.

5. Missing evidence to request

Ask the supplier or senders to provide the correct delivery list that matches the order, the machine or asset reference, the required sidewall specification, and the rim or axle position for the intended use.

If the supplied documents are incomplete, request the missing packing list, delivery note, batch record, or written clarification of the mismatched line. Ask for clear photos of any label or marking that is unreadable.

6. Procurement next step

The next step is written clarification and agreed handling. The receiving team should send the discrepancy record and photographs to the supplier or responsible procurement contact and ask whether to hold, return, or accept the item.

Do not install or test the disputed item before written clarification is received. Only the responsible parties decide acceptance.

7. External record-organising support

The receiving team may use an external commercial platform to organise the disputed sidewall, rim label, and delivery-list entries with their order lines and receipt photos. This is not a guarantee of replacement, reimbursement, or acceptance.

MechLink is one such platform: MechLink website or WhatsApp +62 81292273888. Use it for record organisation and supply enquiry only, not as an official manufacturer or dealer contact.

8. Sources

No external standards, reports, or certification sources were used for this receiving-check guidance. The article describes a document- and photograph-based comparison method only.